Fayettenamcanesfan
Well-known member
He’s been steady back there. Good value signing for sure.
$1.225 AAVSo, it's 4 years, $4.9 million. Is that ~$5 million per year or total?
The pace of construction inside is moving slowly too. The alleged bar on the 3rd floor is still under construction. There are temporary walls up blocking access to that part of the concourse and there are signs at the top of the escalator directing fans to their sections. There is a concession stand surrounded by temporary walls. They took down the counters and charging stations between concourse entrances.Just FWIW, I just talked to my Dad about State football tickets and parking for next season and he got an email yesterday from the Wolfpack Club announcing that there would be no site development work until after the conclusion of State's 2026 football schedule ... so, basically Thanksgiving at the earliest. Seeing as how that's a terrible time to start that kind of project, it might even stretch out until the Spring of 2027.
I'm still struggling to understand what the plan for arena parking will be once they close most of the paved parking west of the arena, but whatever. It's getting kicked down the road so that's a problem for another year/season.
Same with the party deck (still under black tarps) and the areas that have temporary construction walls on the lower concourse also haven't budged. People are starting to grumble, which is to be expected, but honestly EVERY construction project in the area has been crippled by labor and supply chain issues over the last 6-8 months. So ... yeah. Not gonna get into the why in this forum. About the only sector that hasn't been impacted in a major way is roadway construction.The pace of construction inside is moving slowly too. The alleged bar on the 3rd floor is still under construction. There are temporary walls up blocking access to that part of the concourse and there are signs at the top of the escalator directing fans to their sections. There is a concession stand surrounded by temporary walls. They took down the counters and charging stations between concourse entrances.
Getting onto Wade from the East 2000 lots has been a nightmare the last 2 or 3 games. But with the new pavement finally down, they should be ready for 2 full exit lanes onto the inner Beltline.On the upside, the new lane configuration on Wade Ave is finally starting to come together and it makes it much easier to get on the beltline heading towards North Hills.
Any chance the STH parking disruption is delayed until next season?At this point, I'm more concerned with the lack of public information about what they plan to do once they break ground on that work in the existing parking areas. By now, they HAVE to have developed some sort of plan, and I suspect it's gonna suck for the fans or else they would have at least talked about it.
The work underway is still underway, just at a slower pace. That happens.
Don’t know if it’s covered in the audio, but FWIW, Kochetkov was in the starter’s net.Rod pc after practice today
Morning skate tomorrow at 11:30 CT (12:30 our time) at Bridgestone Arena
BrindAmour Audio
Don’t know if it’s covered in the audio, but FWIW, Kochetkov was in the starter’s net.
Bussi was interviewed on Sirius XM. Listen below
View: https://x.com/siriusxmnhl/status/2000965276490465335?s=46&t=4d_ggbNsZmyS1Bmjpbp5UA
Beep beep. By the way, I know you’ll get sick of it but I plan to use the bus meme I made after every win (unless I’m shooting a game and not home for it). I mean it’s just to easy and to perfect for the bus to be running over foolsBussi also made a cameo appearance with the Spittin Chiclets gang recently...everyone wants to ride the bus!!!

Thanks for sharing this. Loved Bussi's description of his 18 yr old and 27 yr old self!Bussi was interviewed on Sirius XM. Listen below
I think it will be. They were pretty vague when they extended us to March so hopefully they'll include the rest of the season and any post season games.Any chance the STH parking disruption is delayed until next season?